Network infrastructure expansion will lag load growth, driven primarily by the rapid expansion of data centers to support artificial intelligence. Data hub developers are looking to gain a first-to-market advantage and are eager to find ways to connect to the grid as soon as possible. Demand response (DR) – a voluntary reduction in power consumption during peak hours – is one method to ensure that new loads can be integrated into grids despite current capacity constraints. Enverus Intelligence® Research’s (EIR) new report measures the efficacy of DR for rapidly connecting new loads to the grid.

Using hourly operating data from the EIA, EIR estimates that PJM and MISO have the greatest ability to accommodate new loads with DR. At only 100 hours of DR, PJM and MISO can add 11.9 GW and 8.2 GW, respectively. CAISO would see the greatest utilization of idle resources, with the added capacity at 100 hours (5.8 GW) making up 14% of peak net load. These values increase proportionally with the number of DR hours. Although promising, large loads with high-reliability requirements, such as data centers, may lack the capability to reduce their power consumption without expanded backup generation. Furthermore, increasing loads without expanded infrastructure may lead to higher wholesale power prices.

Research Highlights:

Enverus Intelligence® | Research, Inc. (EIR) is a subsidiary of Enverus that publishes energy-sector research focused on the oil, natural gas, power and renewable industries. EIR publishes reports including asset and company valuations, resource assessments, technical evaluations and macro-economic forecasts, and helps make intelligent connections for energy industry participants, service companies and capital providers worldwide. See additional disclosures here. 

Picture of Elliot Ryland

Elliot Ryland

Elliot joined the Enverus Intelligence Research (EIR) team in March 2025. He has his Masters of Public Policy from the University of Calgary's School of Public Policy. He has extensive experience in the public sector, having previously worked with Alberta Wildfire, Environment and Climate Change Canada, and the Canada Energy Regulator. Elliot is interested in all things related to data modelling, with his current work focusing on power system optimization models.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
Enverus Press Release - OFS prices expected to bottom out by year’s end
Post
Trading & Risk
ByAl Salazar, Enverus Intelligence® Research (EIR) Contributor

How the Venezuela oil deal impact on Canada oil sands changes Gulf Coast competition and pipeline math.

Enverus Intelligence® Research Press Release - The Canadian oil sands’ low-breakeven resource advantage
Post
Financial Services
ByEnverus

See how one upstream operator moved field ticketing and AFE approvals off paper, capturing the financial authority signature once to cut manual work downstream.

Enverus Press Release - Enverus honored as one of Alberta’s leading employers
Post
Energy Analytics
ByJimmy Fortuna

Waiting on AI adoption isn't a neutral choice. See where the cost of delay actually shows up, in lost work, lost expertise, and lost ground.

Enverus Press Release - How much production growth can North America deliver over the next decade?
Post
Trading & Risk
ByChris Griggs

Spot five signs your market data maintenance is slowing analysis and learn quick fixes to streamline workflows.

Enverus Press Release - Prioritizing renewable PPA offtaker targets proves more challenging than expected
Post
Trading & Risk
ByAdam Robinson, Enverus Intelligence® | Research (EIR) Contributor

FORGE tests extended circulation to study enhanced geothermal system water loss and validate sub-1% recovery assumptions.

Enverus Intelligence® Research Press Release - Until LNG demand arrives, natural gas expected to struggle at $3
Post
Power & Renewables
ByEnverus

Enverus identified the ERCOT July 2026 coincident peak one day in advance. See how our day-ahead forecasts outperformed ERCOT during a critical summer heat wave.

Enverus Press Release - CO2 pipeline economics: The missing link
Post
Power & Renewables
ByEnverus

PJM's August 2026 base case sits above market on heat rate, with RGGI costs and capacity risk keeping the stack tight even as transmission relief arrives.

Enverus Intelligence® Research Press Release - Pains and Gains in the Haynesville
Post
Trading & Risk
ByAmyra Mardhani, Enverus Intelligence® | Research (EIR) Contributor

Six ISOs seek delays as FERC presses large-load tariff reform to clarify rules and risks for developers and customers.

Enverus Press Release - Enverus Earns Top Workplaces Honors for Fourth Consecutive Year
Post
Power & Renewables
ByEnverus

MISO's August 2026 outlook: softer peaks vs. July, forecast converging with the market, and new Gulf Coast gas capacity reshaping South flows.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?