March 10-13, 2024
Phoenix, AZ
Booth #35

Use Code 2403355 to Save 10%

See Who's Attending

sarp-ozkan

Sarp Ozkan

VP Commercial Product

hakan

Hakan Corapcioglu

Lead Technical Advisor

kevin-kang

Kevin Kang

Intelligence Associate

mallorie-sulaski

Mallorie Sulaski

Account Executive

anton-vykhodtsev

Anton Vykhodtsev

Senior Intelligence Associate

amy-hetrzog

Amy Hertzog

Strategic Account Executive

lily-murray

Lily Murray

Account Executiver

brian-stainhouser

Brian Steinhauser

Senior Sales Manager

ben-hatt

Ben Hatt

Senior Sales Manager

andrew-noonan

Andrew Noonan

Territory Manager

Rich Pfeifer

Territory Manager

Panel Discussion: Siting & Interconnection in the New Normal
March 11, 2024 at 4:55 p.m. MT

Sarp Ozkan joins industry leaders from AC Power LLC, ICF and Electric Power Engineers to discuss interconnection backlog challenges and project siting post-IRA.

Moderated by Bryan Cave Leighton Paisner LLP

 
3-deploy-wind-solar

Plan Your Show in Advance

Related Content

Enverus News Release - Utility growth prospects: Quantifying long and short opportunities
Analyst Takes Power and Renewables
ByRob Allerman

For much of March, the California Independent System Operator (CAISO) experienced significant fluctuations in power prices due to congestion, transmission outages and bearish pricing trends in SP-15. My team used Panorama to better understand and the Power Market Publications in...

Enverus Blog - The Texas power market evolution
Power and Renewables
ByRobin Grathwohl

Available transfer capacity (ATC) refers to the remaining power transfer capability within a transmission network. It represents the maximum amount of power that can be transmitted over a transmission line without compromising grid reliability and stability.

geothermal-energy-in-the-us
Power and Renewables
ByGraham Bain

Geothermal energy in the U.S. is gaining ground, thanks to initiatives like the Enhanced Geothermal Shot which aims to reduce Enhanced Geothermal Systems (EGS) costs 90% to $45/MWh by 2035.

Enverus blog - Sundown on California solar power premiums
Power and Renewables
ByKatherine Paton-Ilse

As solar generation continues to dominate the renewable energy industry, siting projects is becoming increasingly difficult.

Enverus News Release - Utility growth prospects: Quantifying long and short opportunities
Power and Renewables
ByAmanda De La Rosa

In the rapidly evolving landscape of the power market, the interconnection queue stands as at a critical juncture for new energy projects seeking to integrate with the existing grid infrastructure.

accurate-grid-forecastin
Energy Transition Intelligence
ByJoseph Gyure, Editor, Enverus Intelligence

Ørsted took a blade to its project pipeline, reducing its ambition to 35-38 GW of installed capacity by 2030 from the previous 50 GW.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Register Today

Sign Up

Power Your Insights

Connect with an Expert

Access Product Tour

Speak to an Expert