March 6-8, 2024
Banff, Alberta, Canada

Enverus is proud to be a sponsor of the WSPP Spring 2024 Operating Committee Meeting! Join us at the stunning Fairmont Banff Springs for a in-depth look at electric wholesale markets and how we can all move the industry forward. Meet with our team to see how our newest solutions in CAISO can empower you to make smarter, quicker, more confident trading decisions to stay ahead in today’s dynamic energy landscape.

Meet our Experts

rob-allerman

Rob Allerman

Sr. Director of Markets

chris-windburn

Chris Winburn

Sr. Account Executive

joe-salgado

Joe Salgado

Account Executive

jim-schumacker

Jim Schumacker

Technical Advisor

Book Time with Our Team

Related Content

Enverus News Release - Utility growth prospects: Quantifying long and short opportunities
Analyst Takes Power and Renewables
ByRob Allerman

For much of March, the California Independent System Operator (CAISO) experienced significant fluctuations in power prices due to congestion, transmission outages and bearish pricing trends in SP-15. My team used Panorama to better understand and the Power Market Publications in...

Enverus Blog - The Texas power market evolution
Power and Renewables
ByRobin Grathwohl

Available transfer capacity (ATC) refers to the remaining power transfer capability within a transmission network. It represents the maximum amount of power that can be transmitted over a transmission line without compromising grid reliability and stability.

geothermal-energy-in-the-us
Power and Renewables
ByGraham Bain

Geothermal energy in the U.S. is gaining ground, thanks to initiatives like the Enhanced Geothermal Shot which aims to reduce Enhanced Geothermal Systems (EGS) costs 90% to $45/MWh by 2035.

Enverus blog - Sundown on California solar power premiums
Power and Renewables
ByKatherine Paton-Ilse

As solar generation continues to dominate the renewable energy industry, siting projects is becoming increasingly difficult.

Enverus News Release - Utility growth prospects: Quantifying long and short opportunities
Power and Renewables
ByAmanda De La Rosa

In the rapidly evolving landscape of the power market, the interconnection queue stands as at a critical juncture for new energy projects seeking to integrate with the existing grid infrastructure.

accurate-grid-forecastin
Energy Transition Intelligence
ByJoseph Gyure, Editor, Enverus Intelligence

Ørsted took a blade to its project pipeline, reducing its ambition to 35-38 GW of installed capacity by 2030 from the previous 50 GW.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Register Today

Sign Up

Power Your Insights

Connect with an Expert

Access Product Tour

Speak to an Expert