Understanding the timing of each stage of preproduction, known as efficiency metrics, is imperative for having confidence in forecasting cycle times of operators and service companies. This helps ensure equipment is fully utilized and groups know what’s needed for each development phase.

To decipher efficiency metrics, it’s necessary to create a complete picture of what happens pre-production, including permits, pad construction, spud, rig release, DUC and turning-in-line first production.

Luckily, Enverus has made identifying these metrics easier than ever. Let’s take a look at three key efficiency metrics that can be identified using Enverus’ Activity Analytics within PRISM.

Conversion rates: Identify areas of growth

Conversion rate is a good key performance indicator (KPI) for permit as it helps identify areas where operators continue to invest by showing who follows through on drilling commitments. As we have seen in areas like the Delaware Basin, where regulatory environments can be in flux, operators may stock up on permits before administration changes. But those permits aren’t a true indication of planned activity. Being able to identify continued investment beyond the initial drilling permit instills confidence in which sites will be developed and where production will be coming from.

We can look at conversions, or the number of permits with detected pad construction. Evaluating conversions across basins helps decide if permits are good indicators for growth.

Permit numbers  can be a quick way to gauge changes in future activity. However, some basins are far from a reliable indicator. PRISM Activity Analytics makes it easy to see this KPI change. As illustrated in Figure 1, Marietta has an ideal conversion rate of 1-1. This instills more confidence in areas with high conversion rate, compared to San Juan or even parts of the Permian where permits are more speculative.

For drilling, we can add confidence to our analysis by detecting exactly when rigs move to the pad, based on proprietary GPS unit data. This gives us a better sense of the changing market share, who’s holding steady, declining or increasing.

Figure 1: Conversion rate for permitted pads to pad construction.

DUC inventory count: Indicator for future activity

As we consider outstanding investments in an area, DUC inventory is a key metric that offers insights on future activity levels. During the pandemic, we observed operators following through on drilling commitments and completing rig contracts, but not bringing frac crews on site to convert the DUCs.

Figure 2: Exxon Permian rigs through time.

For example, in Figure 2 and 3, we see Exxon maintaining their rig obligations in the Permian through the first portion of 2020, with an associated DUC build, but not bringing crews to continue work on those DUCs until much later.

Figure 3: Exxon Permian DUCs through time.

With PRISM, we can see frac crews arriving on site and determine how long the DUCs have been sitting to evaluate which is closest to development. Not all DUCs are created equal, so understanding which well will be prioritized allows for more competitive service bids, better volume predictions and more accurate understanding of oilfield activity.

Downtime: Improve planning and financial modeling

Understanding the typical duration for each instance of work and the downtime between development phases enables better planning and financial modeling. With Activity Analytics, we can evaluate efficiency at every stage, including KPIs for:

  • Permit to spud. Instead of taking a permit at face value, users can understand how immediately applicable a permit is to an operator’s development schedule, and how likely the permit is to be acted upon.
  • Spud to rig release. Given that not all drilling jobs require equal work, users can anticipate how long equipment will be needed on site, allowing for more competitive bid creation and higher win rates.
  • Completion to first production. Ideally, all available production will be turned in line as soon as possible. However, timing may be dependent on infrastructure constraints, weather conditions or lease conditions. Understanding the turnaround time from completion to TIL allows users to understand when volumes will enter gathering systems and impact prices, and when different equipment will be necessary.

Data for Lower 48 basins indicates that the overall efficiency timeline takes from a few months to more than a year, underscoring the need to get to know your operators’ behavior. PRISM also makes it easy to apply a cluster plot to any of these well stages to get a feel for how much we can trust the numbers.

Activity Analytics provides insight into each separate phase of development, from permit to production, and enables more specific business development, transparency into proposed schedules and enhanced equipment utilization. Without PRISM, teams are reliant solely upon reported data and quarterly updates.

Click here to learn more about how Activity Analytics can help you optimize the many stages of preproduction, and fill out the form below to speak with an Enverus expert.

Picture of Enverus

Enverus

Energy’s most trusted SaaS platform — creating intelligent connections that uncover insights and opportunities to deliver extraordinary outcomes.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content

Enverus Intelligence® Research Press Release - Wood you believe it? BECCS is taking off and creating overlooked, lucrative opportunities
Energy Transition
ByNoor Qureshi

Explore the EPA's historic Renewable Fuel Standard mandates and their effect on biofuel supply and market dynamics.

Enverus Press Release - Redesigning ancillary markets: Reliability in a renewable future
Generative AI
ByManuj Nikhanj

The question isn’t what gets automated. It’s what becomes possible when you ask more of people, not less.  Too much of the AI conversation is trapped in the wrong frame: what jobs disappear, what tasks get automated, how much cost...

Enverus Press Release - Lessons learned from Eaton and the risk of wildfires spread by transmission lines
Power and Renewables
ByEnverus

Our SPP system‑wide load forecasting continues to deliver exceptional accuracy and consistency, reflecting the overall high performance of our forecasting portfolio. Enverus provides 15‑day‑ahead hourly forecasts for both SPP system demand and the individual balancing authorities across SPP, supporting reliable planning and...

Enverus Intelligence® Research Press Release - Wood you believe it? BECCS is taking off and creating overlooked, lucrative opportunities
Energy Market Wrap
ByEnverus

This week’s energy headlines spotlight rising Delaware Basin growth, bold balance sheet moves, record federal leasing demand, new high-volume midstream contracting, and sustained shipper interest in a major Rockies corridor.

Enverus Intelligence® Research Press Release - Winning in the West: Renewed opportunities are resurfacing in the DJ and PRB’s Niobrara
Energy Transition
ByBrynna Foley, Enverus Intelligence® Research

The scrapping of a planned 600 MW expansion at the Stargate data center in Abilene, Texas, serves as a reminder that large load interconnection queues continue to be inflated.

Enverus Intelligence® Research Press Release - OPEC+ cuts and Trump tariffs force price downgrade
Financial Services
ByEnverus

Discover emerging energy investment opportunities driven by AI and geopolitical shifts in the power sector. Learn from industry experts.

Enverus Intelligence® Research Press Release - Recap: How the Trump Administration is reshaping energy markets
Analyst Takes Trading and Risk
ByAl Salazar, Enverus Intelligence® Research (EIR) Contributor

Learn about the impact of Middle East energy disruptions on oil supply and global markets. Stay informed with Enverus Intelligence® Research.

Enverus Intelligence® Research Press Release - Surge in clean energy demand intensifies market competition
Power and Renewables
ByEnverus

In 1982, The Clash released “Should I Stay or Should I Go.” And while generator interconnection was unlikely their muse, the chorus does ring true for project developers navigating the interconnection process.  Similar to the tenuous relationship in the song, the...

Enverus Intelligence Research Press Release - Upstream M&A sails to $17 billion in 1Q25
Business Automation
ByIan Elchitz

In oil and gas, negotiated pricing only creates savings when enforced during execution. See how early pricing compliance protects cost control and margin.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?

Ready to Subscribe?

Sign Up

Power Your Insights