Weather conditions and swaths of undeveloped land make MISO a high-value region for utility-scale renewable projects. However, solar and wind developers are constrained by queue/transmission issues, local opposition misinformation, and supply chain challenges on both the development side and utility side. This session focuses on the project execution landscape and considers how developers are dealing with financing, IRS guidance, capital markets, equipment strategies, labor, interconnection and the thousand other items needed to expand development in MISO.
Speaker: Sarp Ozkan
2023 witnessed remarkable strides in enhancing power generation and infrastructure across the United States. Notably, power capacity increased from 6,580 megawatts (MW) in 2022 to 10,993 MW in 2023, a significant 67.07% increase. These are the top 10 engineering and procurement companies (EPCs) that brought the most power online in the U.S.
Read Blog
https://www.enverus.com/blog/top-10-u-s-epcs-in-2023/
In total, the top 10 U.S. transmission line owners have 1,404.35 miles of transmission lines since 2023, which is approximately the driving distance from New York City to Miami, Florida. See the top 10 U.S. transmission line owners by miles since 2023 below:
Read Blog
https://www.enverus.com/blog/top-10-u-s-transmission-line-owners-by-miles/
Discover
About Enverus
Resources
Follow Us
© Copyright 2025 All data and information are provided “as is”.