3 Key Efficiency Metrics for Enhanced Operations With Enverus PRISM® Activity Analytics

Adding confidence to efficiency metrics

byEnverus
December 6, 2022

Understanding the timing of each stage of preproduction, known as efficiency metrics, is imperative for having confidence in forecasting cycle times of operators and service companies. This helps ensure equipment is fully utilized and groups know what’s needed for each development phase.

To decipher efficiency metrics, it’s necessary to create a complete picture of what happens pre-production, including permits, pad construction, spud, rig release, DUC and turning-in-line first production.

Luckily, Enverus has made identifying these metrics easier than ever. Let’s take a look at three key efficiency metrics that can be identified using Enverus’ Activity Analytics within PRISM.

Conversion rates: Identify areas of growth

Conversion rate is a good key performance indicator (KPI) for permit as it helps identify areas where operators continue to invest by showing who follows through on drilling commitments. As we have seen in areas like the Delaware Basin, where regulatory environments can be in flux, operators may stock up on permits before administration changes. But those permits aren’t a true indication of planned activity. Being able to identify continued investment beyond the initial drilling permit instills confidence in which sites will be developed and where production will be coming from.

We can look at conversions, or the number of permits with detected pad construction. Evaluating conversions across basins helps decide if permits are good indicators for growth.

Permit numbers  can be a quick way to gauge changes in future activity. However, some basins are far from a reliable indicator. PRISM Activity Analytics makes it easy to see this KPI change. As illustrated in Figure 1, Marietta has an ideal conversion rate of 1-1. This instills more confidence in areas with high conversion rate, compared to San Juan or even parts of the Permian where permits are more speculative.

For drilling, we can add confidence to our analysis by detecting exactly when rigs move to the pad, based on proprietary GPS unit data. This gives us a better sense of the changing market share, who’s holding steady, declining or increasing.

Figure 1: Conversion rate for permitted pads to pad construction.

DUC inventory count: Indicator for future activity

As we consider outstanding investments in an area, DUC inventory is a key metric that offers insights on future activity levels. During the pandemic, we observed operators following through on drilling commitments and completing rig contracts, but not bringing frac crews on site to convert the DUCs.

Figure 2: Exxon Permian rigs through time.

For example, in Figure 2 and 3, we see Exxon maintaining their rig obligations in the Permian through the first portion of 2020, with an associated DUC build, but not bringing crews to continue work on those DUCs until much later.

Figure 3: Exxon Permian DUCs through time.

With PRISM, we can see frac crews arriving on site and determine how long the DUCs have been sitting to evaluate which is closest to development. Not all DUCs are created equal, so understanding which well will be prioritized allows for more competitive service bids, better volume predictions and more accurate understanding of oilfield activity.

Downtime: Improve planning and financial modeling

Understanding the typical duration for each instance of work and the downtime between development phases enables better planning and financial modeling. With Activity Analytics, we can evaluate efficiency at every stage, including KPIs for:

  • Permit to spud. Instead of taking a permit at face value, users can understand how immediately applicable a permit is to an operator’s development schedule, and how likely the permit is to be acted upon.
  • Spud to rig release. Given that not all drilling jobs require equal work, users can anticipate how long equipment will be needed on site, allowing for more competitive bid creation and higher win rates.
  • Completion to first production. Ideally, all available production will be turned in line as soon as possible. However, timing may be dependent on infrastructure constraints, weather conditions or lease conditions. Understanding the turnaround time from completion to TIL allows users to understand when volumes will enter gathering systems and impact prices, and when different equipment will be necessary.

Data for Lower 48 basins indicates that the overall efficiency timeline takes from a few months to more than a year, underscoring the need to get to know your operators’ behavior. PRISM also makes it easy to apply a cluster plot to any of these well stages to get a feel for how much we can trust the numbers.

Activity Analytics provides insight into each separate phase of development, from permit to production, and enables more specific business development, transparency into proposed schedules and enhanced equipment utilization. Without PRISM, teams are reliant solely upon reported data and quarterly updates.

Click here to learn more about how Activity Analytics can help you optimize the many stages of preproduction, and fill out the form below to speak with an Enverus expert.

Picture of Enverus

Enverus

Energy’s most trusted SaaS platform — creating intelligent connections that uncover insights and opportunities to deliver extraordinary outcomes.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content

Enverus Press Release - How much production growth can North America deliver over the next decade?
Minerals
ByPhillip Dunning
December 11, 2025

Discover 5 crucial tax strategies for mineral and royalty owners to maximize savings and minimize tax liability. Learn about deductions, 1031 exchanges, and more to ensure you don't overpay this tax season.

Enverus Press Release - Enverus releases “2025 Interconnection Queue Outlook” to navigate backlogged grid challenges
Power and Renewables
ByVirginia Fishburn
December 10, 2025

2025 was an unprecedented year for renewable energy, but our customers led the charge. At Enverus, we’re proud to empower developers with the tools and insights they need to accelerate the energy transition. This year’s results speak volumes about what’s...

Enverus Press Release - Utica oil: America’s modest middleweight contender
Energy Transition
ByNoor Qureshi
December 10, 2025

Exxon Mobil paused plans for a blue hydrogen project at its Baytown, Texas, complex, which would have been among the world’s largest, citing insufficient market demand.

Enverus Press Release - Enverus Acquires BidOut, energy’s leading AI-powered procurement platform provider
Energy Market Wrap
ByEnverus
December 9, 2025

Top energy stories: Crescent sells DJ assets, Black Stone inks Haynesville deal, Chord drills 4-mile laterals, Targa buys Delaware assets, and more.

Antero Swaps Utica for Marcellus with HG Buy, Divestment to Infinity
Analyst Takes News Release
ByAndrew Dittmar
December 8, 2025

Antero Resources reshapes its Appalachian portfolio with a $2.8B Marcellus acquisition from HG Energy and a $1.2B Utica divestment to Infinity, signaling bullish momentum for natural gas M&A.

Enverus Press Release - Enverus Acquires BidOut, energy’s leading AI-powered procurement platform provider
Business Automation
ByNicholas Skuba
December 8, 2025

Operators face mounting pressure to control costs and maximize efficiency. Traditional procurement methods often rely on manual processes and a limited pool of suppliers, making it difficult to keep up with market volatility and changing business needs. By digitizing the...

Enverus Press Release - Enverus honored as one of Alberta’s leading employers
Analyst Takes Trading and Risk
ByAl Salazar, Enverus Intelligence® Research (EIR) Contributor
December 8, 2025

Unlock insights into Canada's energy potential. Analyze policy shifts, pipeline development, and LNG Canada's role in meeting global energy demand.

Enverus and Pexapark Press Release - Enverus Enhances Global Trading & Risk Platform with Pexapark’s Benchmark Renewables Pricing and Market Intelligence
Energy Transition
ByCarson Kearl, Enverus Intelligence® Research (EIR) Contributor
December 3, 2025

Enverus Intelligence® Research (EIR) estimates an average load growth of about 12 GW in PJM by 2035, driven primarily by data center load expansion. PJM’s independent market monitor filed a complaint arguing the grid operator has clear authority to delay...

Enverus Press Release - Enverus releases “2025 Interconnection Queue Outlook” to navigate backlogged grid challenges
Power and Renewables
ByEnverus
December 2, 2025

October in ERCOT brought a mix of seasonal challenges—unusually warm temperatures early in the month, a sharp cooldown later, and notable variability in renewable generation. These conditions tested the accuracy of short-term and day-ahead forecasts, which are essential for power...

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Register Today

Sign Up

Power Your Insights

Connect with an Expert

Access Product Tour

Speak to an Expert