Power & Renewables

Streamlining Parcel Discovery for Power Projects With Contiguous Acreage

byMarie Amice

Traditionally, developers relied on finding areas suitable for power project siting and then looking through individual parcels in their areas of interest to identify the owners and county of the parcels. This process was time consuming and often overlooked the crucial aspect of contiguity among owners. As a result, navigating regulations and conducting outreach became needlessly complex, especially in areas involving multiple owners and counties.

Fortunately, there’s now a solution that addresses this challenge head-on. By integrating contiguity into the analysis, Enverus Power and Renewables Suitable Land Analytics Contiguous Acreage enhancement helps identify multiple parcels under the same ownership, simplifying negotiations and regulations needed to be followed, making the parcel outreach faster and bolstering overall project viability.

Finding Parcels for a Wind Power Project

Let’s explore how the parcel siting process for a wind project within a 2-mile radius of the planned transmission project OTTUMWA-SKUNK RIVER 345 KV TRANSMISSION LINE PROJECT unfolds with the Contiguous Acreage enhancement.

The OTTUMWA-SKUNK RIVER 345 KV TRANSMISSION LINE PROJECT represents a key component within the expansive MISO Long-Range Transmission Plan. In line with this strategic framework, the transmission line is set to be a collaborative effort between ITC Midwest and MidAmerican Energy, jointly owned to ensure effective management and operation. With ITC assuming the crucial role of overseeing the day-to-day operations and maintenance of the line, this project underscores a shared commitment to enhancing regional electric transmission infrastructure.

Within the radius, roughly 4,000 parcels need screening for wind potential. Previously, developers would assess parcel owners, average wind speeds and buildable acreage individually, which takes one month of two dedicated workers full time to pull this information. This process was laborious, often requiring investigation into neighboring parcels to gather additional data on wind potential, ownership and county regulations, and requires the full-time dedication of two employees for an entire month to compile the necessary information. Dealing with multiple owners or counties added complexity to negotiations and compliance efforts.

average-wind-speed-vs-buildable-acreage
Parcel ownership based on Average Wind Speed at 100M(M/S) versus Buildable Acreage

With Enverus PRISM® Power and Renewables Suitable Land Analytics, developers can gain insights into parcel ownership, buildable acreage and average wind speeds aggregated by the owner, facilitating more efficient analysis. Jadoc Inc. initially ranks first as the best combination of buildable acreage and wind resources. However, despite appearing promising the parcels are fragmented across different locations.

Leveraging Contiguous Acreage Enhancement

Here’s where Contiguous Acreage proves invaluable. By analyzing parcels based on contiguous ID, representing parcels grouped under the same ownership, developers can identify parcel owner and county groupings that are the most promising from a wind speed and buildable acreage perspective.

In this particular instance, the average wind speed at 100 m is 7.97 m/s, so the Kaska Farm Corp parcels from a wind speed, contiguity and buildable acreage perspective is more ideal for wind development compared to the Jadoc Inc. parcels identified previously.

Moving forward, users can delve deeper into land buildability with Enverus Power and Renewables Suitable Land Analytics add-on, identifying potential environmental constraints with precision.

In conclusion, the integration of Contiguous Acreage into the parcel siting process represents a significant advancement in power project development. By shifting the focus from individual parcels to contiguous land groupings, developers can streamline the analysis, optimize resource utilization and enhance overall project viability. The ability to identify truly contiguous parcels not only simplifies negotiations and regulatory compliance but also maximizes the potential for efficient project execution.

Picture of Marie Amice

Marie Amice

Senior Project Manager, Power & Renewables at Enverus

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
Enverus Media Advisory - Trump vs. Harris: A tale of two energy policies
Post
Power & Renewables
ByAdam Robinson, Enverus Intelligence® | Research (EIR) Contributor

Google anchors Cape Station, but geothermal power deliveries carry water, drilling and equipment risk. EIR explains who holds that risk.

U.S. natural gas prices face power demand drag
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Enverus Press Release - Enverus releases Investor Analytics: Refined, actionable financial insights at your fingertips
Post
Power & Renewables
ByAlex Nevokshonoff, Senior Analyst, Enverus Intelligence® | Research (EIR) Contributor

Reciprocating engine backlogs surge as developers favor modular gas-fired BTM solutions for faster time-to-power and shorter lead times.

Natural gas power M&A premiums double as data center demand and capital costs transform U.S. energy market
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s PJM and MISO winter outlook: a record El Niño, capped capacity auctions, MISO scarcity risk and heat rate forecasts for Dec. through Feb.

Aging-power-plant_1418205261-1
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s ISO-NE and NYISO winter outlook: how NECEC and CHPE reshape Northeast spreads, plus RGGI costs, El Niño weather and heat rate forecasts.

EIR’s model shows powered-land can rise more than 20-fold in value as data center sites reach energization
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s CAISO and Mid-C winter outlook: how a stormy El Niño, record battery activity, EDAM vs. Markets+ and carbon prices shape Western power.

Time-to-power gap Big generation’s Achilles’ heel in the AI data center race
Post
Power & Renewables, Power Trading
ByEnverus

PJM has 113.6 GW of announced large-load capacity, far more than the 28.5 GW under construction. See what the gap means for reliability and planning.

U.S. natural gas prices face power demand drag
Post
Power & Renewables, Power Trading
ByEnverus

ERCOT data shows large loads ramping at different rates as solar and battery additions keep pace, with new supply expected to slow in 2027.

Enverus Press Release - Prioritizing renewable PPA offtaker targets proves more challenging than expected
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?