Streamlining Parcel Discovery for Power Projects With Contiguous Acreage

byMarie Amice

Traditionally, developers relied on finding areas suitable for power project siting and then looking through individual parcels in their areas of interest to identify the owners and county of the parcels. This process was time consuming and often overlooked the crucial aspect of contiguity among owners. As a result, navigating regulations and conducting outreach became needlessly complex, especially in areas involving multiple owners and counties.

Fortunately, there’s now a solution that addresses this challenge head-on. By integrating contiguity into the analysis, Enverus Power and Renewables Suitable Land Analytics Contiguous Acreage enhancement helps identify multiple parcels under the same ownership, simplifying negotiations and regulations needed to be followed, making the parcel outreach faster and bolstering overall project viability.

Finding Parcels for a Wind Power Project

Let’s explore how the parcel siting process for a wind project within a 2-mile radius of the planned transmission project OTTUMWA-SKUNK RIVER 345 KV TRANSMISSION LINE PROJECT unfolds with the Contiguous Acreage enhancement.

The OTTUMWA-SKUNK RIVER 345 KV TRANSMISSION LINE PROJECT represents a key component within the expansive MISO Long-Range Transmission Plan. In line with this strategic framework, the transmission line is set to be a collaborative effort between ITC Midwest and MidAmerican Energy, jointly owned to ensure effective management and operation. With ITC assuming the crucial role of overseeing the day-to-day operations and maintenance of the line, this project underscores a shared commitment to enhancing regional electric transmission infrastructure.

Within the radius, roughly 4,000 parcels need screening for wind potential. Previously, developers would assess parcel owners, average wind speeds and buildable acreage individually, which takes one month of two dedicated workers full time to pull this information. This process was laborious, often requiring investigation into neighboring parcels to gather additional data on wind potential, ownership and county regulations, and requires the full-time dedication of two employees for an entire month to compile the necessary information. Dealing with multiple owners or counties added complexity to negotiations and compliance efforts.

average-wind-speed-vs-buildable-acreage
Parcel ownership based on Average Wind Speed at 100M(M/S) versus Buildable Acreage

With Enverus PRISM® Power and Renewables Suitable Land Analytics, developers can gain insights into parcel ownership, buildable acreage and average wind speeds aggregated by the owner, facilitating more efficient analysis. Jadoc Inc. initially ranks first as the best combination of buildable acreage and wind resources. However, despite appearing promising the parcels are fragmented across different locations.

Leveraging Contiguous Acreage Enhancement

Here’s where Contiguous Acreage proves invaluable. By analyzing parcels based on contiguous ID, representing parcels grouped under the same ownership, developers can identify parcel owner and county groupings that are the most promising from a wind speed and buildable acreage perspective.

In this particular instance, the average wind speed at 100 m is 7.97 m/s, so the Kaska Farm Corp parcels from a wind speed, contiguity and buildable acreage perspective is more ideal for wind development compared to the Jadoc Inc. parcels identified previously.

Moving forward, users can delve deeper into land buildability with Enverus Power and Renewables Suitable Land Analytics add-on, identifying potential environmental constraints with precision.

In conclusion, the integration of Contiguous Acreage into the parcel siting process represents a significant advancement in power project development. By shifting the focus from individual parcels to contiguous land groupings, developers can streamline the analysis, optimize resource utilization and enhance overall project viability. The ability to identify truly contiguous parcels not only simplifies negotiations and regulatory compliance but also maximizes the potential for efficient project execution.

Picture of Marie Amice

Marie Amice

Senior Project Manager, Power & Renewables at Enverus

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
Time-to-power gap Big generation’s Achilles’ heel in the AI data center race
Post
Power & Renewables, Power Trading
ByEnverus

PJM has 113.6 GW of announced large-load capacity, far more than the 28.5 GW under construction. See what the gap means for reliability and planning.

U.S. natural gas prices face power demand drag
Post
Power & Renewables, Power Trading
ByEnverus

ERCOT data shows large loads ramping at different rates as solar and battery additions keep pace, with new supply expected to slow in 2027.

Enverus Press Release - Prioritizing renewable PPA offtaker targets proves more challenging than expected
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Enverus Press Release - Renewable diesel: Too much of a good thing?
Post
Data Centers, Financial Services+1
  • Power & Renewables
ByEnverus

Validate data center natural gas supply: check pipeline capacity, contracts, routing, and long‑term durability before you commit.

Enverus Press Release - How much production growth can North America deliver over the next decade?
Post
Power & Renewables
ByEnverus

See how Enverus called ERCOT's August 2026 coincident peak a day early and pinpointed the exact peak hour, beating ERCOT's own load forecast accuracy.

Enverus Intelligence® Research Press Release - Recap: How the Trump Administration is reshaping energy markets
Post
Power & Renewables
ByEnverus

Learn how utilities, hyperscalers, and developers can score assets, align stakeholders, and structure power agreements that close faster and withstand scrutiny.

Enverus Intelligence® Research Press Release - Haynesville operators calculate remaining growth
Post
Power & Renewables
ByEnverus

Learn how utilities, hyperscalers, and developers can score assets, align stakeholders, and structure power agreements that close faster and withstand scrutiny.

Enverus Press Release - E&Ps with natural gas + CCS pave way for model data center development
Post
Power & Renewables
ByEnverus

MISO hit its $10,000/MWh cap on Sept. 2 as evening load surged, solar output collapsed, and imports weakened, triggering an EEA2 alert.

Enverus Intelligence® Research Press Release - Enhanced geothermal systems: The future of reliable, green power for AI data centers?
Post
Power & Renewables
ByEnverus

A $1 million-per-MW gap separates buying gas capacity from building it. See why utilities rarely run that comparison, and what it takes to defend the answer.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?