Power & Renewables

How Enverus Beats Public Data

byDavid Watson

As the process to successfully build profitable renewable assets becomes more challenging, the need for accurate and up-to-date data on the power grid is needed more than ever. Asset owners, developers, engineers and suppliers need to comprehend the power market at scale to be able to make well-informed decisions in a time where the smallest misunderstanding in data can lead to project failure. 

Project data is published across many different websites and in a variety of formats. It can be laborious and inefficient to gather it and make the necessary connections independently. Usually, companies end up relying on a few respected organizations as their source of truth. Commonly trusted sources are independent system operator (ISO) interconnection queues and reports from the U.S. Energy Information Administration (EIA).  

But what happens when this data is not published in a timely manner or is published with incorrect information? Opportunities can be missed, leading to delays in project development, increased costs and losing out to competitors. In an industry where timing and precision are crucial, missing key opportunities can mean the difference between success and failure in securing new projects or investments. Those working in the energy industry need to feel confident in the data they are working with to stay ahead of their competition and set themselves up for the best opportunities. 

This is why many businesses in power markets are turning to trusted data partners to access the most up-to-date and reliable information. However, not all data is created equal, and when millions of dollars are on the line, it’s critical to work with a partner that can deliver the highest quality data with confidence.  

Enverus stands out as the only provider offering the most comprehensive, analytics-ready data, with broader project coverage and delivering more value across the power markets than any other energy data provider. Additionally, Enverus has a dedicated team of analysts across the world who not only parse through data and make connections but also apply their own expertise to uncover insights and enhance the value Enverus provides. Every source is cross-checked and verified before the data is integrated into the Enverus PRISM® platform.  

The team of analysts makes new updates to the dataset every day from major sources like ISO queues, EIA, FERC, utility queues, PUCs, IRPs, RFPs and more. Enverus also goes beyond traditional data sources by tracking information published in less formalized methods, such as reading news articles from across the country and integrating the information, engaging in project contact outreach and searching for project-specific websites.  

In addition to public sources of information, Enverus has also built models to track physical project construction via satellite imagery that allows for better timelines and more exact coordinates. It accurately tracks key project events including land clearing, solar panel installation and the completion of panel installation. Because of our in-depth tracking across many sources, we are often able to find updates in a timelier manner or even improve upon conflicting or unclear information.  

The Amite Solar Project in Tangipahoa County, Louisiana

The Amite Solar Project in Tangipahoa County, LA, first entered the MISO Interconnection Queue in July 2017 and was immediately added to the PRISM platform by our analysts. MISO reported this project as under construction in November 2019; however, there was no physical construction seen in satellite imagery to confirm this status change. In March 2024, Enverus analysts found a news article that confirmed NextEra had just broken ground on the project. Using this news article and satellite imagery as confirmation, Enverus was able to provide a more accurate picture of this project’s development timeline and projected operating date. In this instance, relying solely on MISO information would have resulted in confusion over where this project was being constructed and incorrect assumptions over the length of the construction period. 

Incorrect timeline data from public sources can easily mislead developers, EPCs, suppliers and asset owners, derailing project expectations and significantly affecting long-term opportunity planning. These missteps can lead to delays, cost overruns and missed contracts, including critical PPAs, putting the entire project’s viability at risk. 

The Hopkins Solar Project in Hopkins County, Texas 

The Hopkins Solar Project in Hopkins County, TX, first entered the ERCOT Interconnection Queue in April 2019. Over the next four years, Enverus continually tracked changes to the commercial operation date, capacity, status and involved companies via the ERCOT Interconnection Queue, public documents, news articles, and Texas Chapter 313 applications. Minor land clearing was seen via our in-house solar imagery tracking system in the second half of 2022. In February 2023, major construction was detected. At this point, Enverus changed the project status to under construction. ERCOT does not provide under construction status updates, so this is a value add from Enverus. EIA does provide under construction status information; however, Hopkins Solar was not added to the EIA 860m report until April 2024 – over a year after construction had kicked off. The project was reported to be operational by ERCOT the following month. In this instance, relying solely on EIA results in extremely outdated data that is published too late to result in any business opportunities. Relying solely on the ERCOT Interconnection Queue results in a decent understanding of the project, but key details like exact coordinates, construction status and suppliers would not be available. 

Picture of David Watson

David Watson

David has been with Enverus for almost 4 years, starting as a contractor. He joined the Power and Renewables Research team in 2022 as a Research Analyst. His work encompasses renewable project news, FERC filing integration, utility queue integration and value add, and data clean-up.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
Enverus Press Release - How much production growth can North America deliver over the next decade?
Post
Power & Renewables
ByEnverus

See how Enverus called ERCOT's August 2026 coincident peak a day early and pinpointed the exact peak hour, beating ERCOT's own load forecast accuracy.

Enverus Intelligence® Research Press Release - Recap: How the Trump Administration is reshaping energy markets
Post
Power & Renewables
ByEnverus

Learn how utilities, hyperscalers, and developers can score assets, align stakeholders, and structure power agreements that close faster and withstand scrutiny.

Enverus Intelligence® Research Press Release - Haynesville operators calculate remaining growth
Post
Power & Renewables
ByEnverus

Learn how utilities, hyperscalers, and developers can score assets, align stakeholders, and structure power agreements that close faster and withstand scrutiny.

Enverus Press Release - E&Ps with natural gas + CCS pave way for model data center development
Post
Power & Renewables
ByEnverus

MISO hit its $10,000/MWh cap on Sept. 2 as evening load surged, solar output collapsed, and imports weakened, triggering an EEA2 alert.

Enverus Intelligence® Research Press Release - Enhanced geothermal systems: The future of reliable, green power for AI data centers?
Post
Power & Renewables
ByEnverus

A $1 million-per-MW gap separates buying gas capacity from building it. See why utilities rarely run that comparison, and what it takes to defend the answer.

Enverus Press Release - Enverus Acquires BidOut, energy’s leading AI-powered procurement platform provider
Post
Power & Renewables
ByEnverus

Most FTR losses come from sound analysis with incomplete visibility. Learn the five pitfalls that separate winning desks from ones that explain away the losses.

Enverus Intelligence® Research Press Release - Until LNG demand arrives, natural gas expected to struggle at $3
Post
Power & Renewables
ByEnverus

Enverus identified the ERCOT July 2026 coincident peak one day in advance. See how our day-ahead forecasts outperformed ERCOT during a critical summer heat wave.

Enverus Press Release - CO2 pipeline economics: The missing link
Post
Power & Renewables
ByEnverus

PJM's August 2026 base case sits above market on heat rate, with RGGI costs and capacity risk keeping the stack tight even as transmission relief arrives.

Enverus Press Release - Enverus Earns Top Workplaces Honors for Fourth Consecutive Year
Post
Power & Renewables
ByEnverus

MISO's August 2026 outlook: softer peaks vs. July, forecast converging with the market, and new Gulf Coast gas capacity reshaping South flows.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?