Texas Electricity Grid of 2050: Challenges and Opportunities
The landscape of the power industry in Texas is undergoing a transformative shift, and the grid of the future won’t be anything like what we are used to. At Enverus, we are at the forefront of this evolution, having developed long-term load and generation forecasts that serve as the foundation for our advanced dispatch model. This model allows us to gain valuable insights into the dynamics of the future grid of Texas.
Presenter: Anton Vykhodstev
Meet RatedPower at CLEANPOWER
RatedPower was acquired by Enverus in 2022. Visit the RatedPower team at Booth #3228. Schedule a demo to learn more about pvDesign and the latest integration with Enverus solutions.
A Quick Guide to Utility-Scale Photovoltaic Plant Design
TThis guide offers a comprehensive overview of essential considerations for designing your upcoming utility-scale solar PV plant. Delve into the intricacies of site selection, configuration, cutting-edge technology, storage solutions, and beyond.
Improving Injection Studies With Available Transfer Capacity
Thorough studies are necessary to evaluate feasibility and grid compatibility, with injection studies being pivotal in assessing stability and reliability. Recognizing the resource-intensive nature of this process, we’ve launched Congestion Analytics, a solution aimed at optimizing workflow and cutting injection study costs by as much as 80%.