Design & Build
Confidently plan, design and optimize your solar project engineering.
RatedPower is an all-in-one, cloud-based software solution that helps project developers, EPCs and engineering companies speed up and optimize the engineering design process for large-scale solar and storage projects.
Define the PV plant location with exclusion areas and MV cable delivery points. Select the topography, weather data and earthworks calculations from proprietary or available sources.
Automatically populate the defined site with chosen equipment. Scan millions of configuration options, compare results and identify the best layout for your plant.
Generate engineering documentation in minutes to continue your project. Get design and energy yield reports, layout, drawings, topography analysis and more.
Enhance your project with the BESS battery storage module. Size, set requirements and visualize a layout alongside your pv design.
Maximize the capacity of your project by identifying the best hardware and configuration. Determine the economics analytics for the lifetime of your project.
Determine feasibility, forecast generation and prices when matched with Enverus Foundations® Power & Renewables.
Virginia's new data center tax and Dominion's GS-5 rate class reveal who really pays for load growth, and which cost-allocation tool actually holds up.
See how Enverus day-ahead solar forecasts outperformed ISO forecasts in ERCOT and CAISO during May–June 2026, including the June heat wave events.
Network upgrade costs can make or break renewable projects. Learn how to model risk early, assess exposure and validate project economics before deals advance.
The edge in renewable M&A isn't more data. It's reaching conviction faster. Here's how to build a defensible shortlist with economics behind every opportunity.
Greenfield costs are up, queues are long, and policy headwinds are real. Here's why more developers are turning to M&A to capture power market tailwinds.
See how Enverus day-ahead wind forecasts outperformed ISO forecasts across ERCOT, SPP, and MISO during high-volatility spring ramp events in April–May 2026.
Let’s get started!
Let’s get started!
We’ll follow up right away to show you a quick product tour.
Ready to Subscribe?
Ready to Get Started?