The Energy Industry’s AI Adoption Curve: Where Are You?

byAkash Sharma

Around 750 million people still live without reliable access to electricity. Plenty more have power but can’t count on it, running on infrastructure built for a different era and straining under load it was never designed to carry. And the capital decisions that used to take months to model now need an answer in days. 

The energy is there. The technology to generate it, find it, move it, and deliver it is there too. What’s missing is the speed at which the people making those decisions can move. 

That’s the gap AI is supposed to close. In most industries, it’s starting to. In energy, it’s more complicated. 

Why Energy is Different

I spend a good part of my week with grid operators, utility planners, engineers, and the people funding all of it. Most of them have already tried an AI tool that didn’t understand the work it was handed, and the skepticism that left behind is earned. 

A generic model can’t tell the difference between a transmission constraint that looks manageable at the system level and one that quietly makes a single project uneconomic. It reads a small land-record discrepancy as a small problem, even when that discrepancy is enough to cloud the whole title. And it has no way to know why the same resource can carry a completely different risk profile depending on where it sits and who owns the ground around it. 

Energy decisions don’t live in documents. They live in the relationships between things: a load forecast and a dispatch curve, a title chain and a land record, a type curve and a capital plan. That structure took the industry decades to build, and a generic model simply doesn’t carry it. Energy AI that produces a confident-sounding output a human still has to check before anyone acts on it isn’t saving time, it’s adding a step. 

The deeper issue sits underneath all of that. Engineers and planners are trained to expect deterministic answers: same inputs, same output, every time. Most AI is probabilistic. It returns the most likely answer from patterns in the data, not a calculation you can trace back to an equation. That’s a different kind of tool, and it calls for a different kind of governance. Most vendors aren’t honest about that distinction. They should be. Successful energy AI adoption starts with that honesty: what the technology does, how it reasons, and what oversight it still requires. 

Where Companies Actually Get Stuck

In my experience, the adoption challenge breaks into three stages, and where you’re stuck tells you what to fix. 

The first stage is Trust. Before AI speeds anything up, people have to believe the output is reliable, auditable, and built on data they recognize. Until they do, the work stays in pilot. I’ve watched technically successful pilots sit on a shelf for two years because no one in the organization trusted the output enough to act on it. At this stage, AI readiness isn’t a technology question. It’s a credibility question: does the system understand our data, our workflows, and our standards well enough to earn a place in the process? 

The second stage is Speed. Once trust is in place, the work changes character. A resource planner who used to spend weeks building a capacity expansion model now runs scenario analysis in an afternoon. A transmission team that spent days pulling constraint data finds the bottleneck that changes a siting decision in minutes. A finance team turns months of valuation work into days. Same people, same expertise, finally working at the pace the job demands. Energy AI at this stage isn’t replacing judgment. It’s multiplying it. 

The third stage is Maturity, and it’s the one that separates the field. Companies that reach it aren’t only moving faster. They’re operating on a different curve. Every workflow that runs through an AI execution layer gets a little smarter. Institutional knowledge stops walking out the door each time a senior engineer retires. The advantage compounds, and the distance between these companies and the ones still debating whether to begin grows wider every quarter. 

Where Are You?

Most energy companies sit in the Trust stage today. The tell is simple: your team reviews every AI output before acting on it, and that review feels necessary rather than optional. That’s not a failure. It’s the right starting point. But staying there has a cost, and that cost grows as competitors move on. 

A smaller group has crossed into Speed. They act first and verify after, because the track record has earned it. Their AI readiness isn’t just a technical posture. It’s embedded in how teams are structured, how decisions get made, and what gets measured. 

Very few have reached Maturity, the point where they design new workflows with AI in the loop from the start instead of retrofitting it onto old ones. 

Knowing your stage is a strategic question, not a philosophical one. It tells you what to prioritize, where you’re leaking value, and how far behind you can afford to fall before the gap turns structural. That’s what Powering the Global Quality of Life comes down to in practice: better technology, and the organizational decisions that put it to work at the speed the world needs. 

Assessment

AI Readiness Checklist

Score your organization across Trust, Speed, and Maturity in five minutes.

Trust
–
Speed
–
Maturity
–
Picture of Akash Sharma

Akash Sharma

VP, product management. Akash works with multiple teams across the Enverus Product organization, providing subject matter expertise on the energy industry for various product innovation and consulting efforts. His expertise lies in unconventional shale reservoirs focusing on reservoir engineering, reserves estimation, production analysis, data-driven modeling, and cross-platform analytics. He has worked on advocacy for data-driven decision making and implementing transformational changes across the energy value chain. Before joining Enverus, he worked as a researcher at the University of Houston, developing workflows for improved EUR estimation using deterministic and probabilistic methodologies and providing valuable inputs to energy investment groups and technical advisory groups. He has been published multiple times with SPE and AAPG in the past and presented at multiple industry and academic conferences. Akash holds an M.S. in Petroleum Engineering from the University of Houston and a B.E. in Petroleum Engineering from the UPES, India.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
Enverus Blog - 6 tax preparation tips for mineral and royalty managers
Post
Minerals
ByEliot Stone

With tax season upon us, mineral and royalty owners face the work of filing returns for their oil and gas income. The rules go beyond federal income tax. State severance taxes, property taxes and estate planning rules can each change...

Enverus releases Top 50 Public E&P Operators of 2024
Post
Operators
ByIan Elchitz

See how one upstream operator moved field ticketing and AFE approvals off paper, capturing the financial authority signature once to cut manual work downstream.

U.S. natural gas prices face power demand drag
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Enverus Intelligence® Research Press Release - Class VI applications signal slowdown
Post
Trading & Risk
ByAl Salazar, Enverus Intelligence® Research (EIR) Contributor

Canada energy budget electrification drives plan to double generation by 2050 while offline oil supply keeps Brent near $100/bbl.

Enverus Press Release - The surprisingly balanced global LNG market
Post
Financial Services
ByColton Wright

Midterm results add local policy risk to shifting data center timelines. Enverus Intelligence Research examines project delays, land pipelines and power contracts.

Enverus Press Release - Enverus releases Investor Analytics: Refined, actionable financial insights at your fingertips
Post
Power & Renewables
ByAlex Nevokshonoff, Senior Analyst, Enverus Intelligence® | Research (EIR) Contributor

Reciprocating engine backlogs surge as developers favor modular gas-fired BTM solutions for faster time-to-power and shorter lead times.

enverus-power-and-renewables-grid
Post
ByEnverus

Ask questions in plain language and quickly turn complex information into structured comparisons, scenarios and actionable insights.

Natural gas power M&A premiums double as data center demand and capital costs transform U.S. energy market
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s PJM and MISO winter outlook: a record El Niño, capped capacity auctions, MISO scarcity risk and heat rate forecasts for Dec. through Feb.

power-grid-congestion
Post
Power Trading, Utilities
ByEnverus

Based on the Enverus Winter Power Market Outlook webinar for ERCOT and SPP, presented by Adam Jordan, Director of Power Analytics. ERCOT has produced only 15 to 30 hours above 60 GW of net load in each of the last...

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?