Power & Renewables

Signed, Not Delivered | Google Anchors Cape Station as FRVO Holds the Delivery Risk

byAdam Robinson, Enverus Intelligence® | Research (EIR) Contributor

GOOGL is now the anchor customer for FRVO’s Cape Station geothermal project in Utah. In its third-quarter update, FRVO identified the eight geothermal generating units, known as GeoBlocks, that will supply GOOGL’s 396 MW contract, with first deliveries expected in mid-2028. GOOGL also holds an option to add ~600 MW by June 2030, bringing its potential purchases to nearly 1 GW. The companies are pursuing the expansion as a behind-the-meter connection to a proposed Google data center campus in Beaver County. Cape Station has ~900 MW of fully contracted offtake, but only 33 MW is operating.

GOOGL is not alone. Enverus Intelligence® Research (EIR) tracks more than 1 GW of U.S. geothermal offtake signed against a ~1.5 GW buildout, with GOOGL accounting for 664 MW across FRVO and ORA projects (Figure 1). Under most of those contracts, the developer or utility absorbs the delivery risk. Buyers lock in clean, firm megawatts, while sellers assume the risk of producing them.

Bar chart of hyperscaler offtake by buyer, project and risk allocation

That risk has not been tested at scale. Cape Station’s design assumes water losses below 1%, compared with 27%-30% at FRVO’s Project Red pilot. Without infill drilling, thermal drawdown reduces well output to nearly zero within 20 years. Equipment supply is also tight. By 2028, FRVO’s annual demand for organic Rankine cycle turbines alone exceeds the industry’s ~300 MW/year of output.

FRVO closed Nov. 17 about 73% below its May peak and below our $15.71/share valuation. GOOGL’s contract demonstrates who will buy geothermal power. Cape Station’s water and production data will show how much of that power gets delivered.

This blog offers just a glimpse of the powerful analysis Power and Energy Transition Research delivers on the trending themes. Don’t miss the full picture.

Organic Rankine cycle turbines, now one of geothermal’s tightest supply bottlenecks, got their start in 1967 at Paratunka on Russia’s Kamchatka Peninsula. The world’s first geothermal binary plant used refrigerant to turn 80°C water, well below boiling, into about 680 kW of power. Google’s 396 MW Cape Station contract alone is about 580 times larger.

Research Highlights:

  • AI Chip Supply | EUV Capacity Caps Power at 37.0 GW
    Enverus Intelligence® Research uncovers how extreme ultraviolet (EUV) lithography capacity will limit AI accelerator supply, must be optimized between memory and logic, and ultimately caps chip power growth through 2030.

Upcoming Events

  • Roadshow: Equipment Constraints and Storage Revenue | Dec. 1–3 | Houston & Dallas | Request a Meeting

  • Webinar: Follow the Load: Where Data Centers Will Need Your Gas | Dec. 3 | 9:00–10:00 a.m. PCT | Online | Register Here

Can power keep pace with AI in 2027?

Load forecasts keep climbing. See where new capacity is getting built, and where it’s falling short.

Top Three Takeaways:

1: Who is the anchor customer for Cape Station geothermal power?

GOOGL is now the anchor customer for FRVO’s Cape Station in Utah. Its 396 MW contract will be supplied by eight GeoBlocks, with first deliveries expected in mid-2028. GOOGL also holds an option to add ~600 MW by June 2030, bringing potential purchases to nearly 1 GW.

2: Who bears the delivery risk on U.S. geothermal contracts?

EIR tracks more than 1 GW of U.S. geothermal offtake signed against a ~1.5 GW buildout. Under most of those contracts, the developer or utility absorbs the delivery risk. Buyers lock in clean, firm megawatts, while sellers assume the risk of producing them.

3: What could stop Cape Station from delivering its contracted geothermal power?

Cape Station has ~900 MW of fully contracted offtake, but only 33 MW is operating. Its design assumes water losses below 1%, compared with 27%-30% at FRVO’s Project Red pilot. Thermal drawdown also reduces well output to nearly zero within 20 years without infill drilling, and FRVO’s annual demand for organic Rankine cycle turbines exceeds industry output by 2028.

About Enverus Intelligence® | Research, Inc. (EIR)

Enverus Intelligence® | Research, Inc. (EIR) is a subsidiary of Enverus that publishes energy-sector research focused on the oil, natural gas, power and renewable industries. EIR publishes reports including asset and company valuations, resource assessments, technical evaluations, and macroeconomic forecasts and helps make intelligent connections for energy industry participants, service companies, and capital providers worldwide. See additional disclosures here.

Picture of Adam Robinson, Enverus Intelligence® | Research (EIR) Contributor

Adam Robinson, Enverus Intelligence® | Research (EIR) Contributor

Adam Robinson joined the Enverus Intelligence® Research team as an Energy Transition Analyst in October 2024, focusing on supporting sustainable energy solutions. He holds a degree in Chemical Engineering from the University of Calgary and brings hands-on experience in pipeline integrity engineering. With a strong foundation in pipeline systems and integrity management, Adam is passionate about leveraging data-driven insights to optimize energy infrastructure and enhance system reliability.

Subscribe to the Enverus Blog

A weekly update on the latest “no-fluff” insight and analysis of the energy industry.

Related Content
U.S. natural gas prices face power demand drag
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Enverus Press Release - Enverus releases Investor Analytics: Refined, actionable financial insights at your fingertips
Post
Power & Renewables
ByAlex Nevokshonoff, Senior Analyst, Enverus Intelligence® | Research (EIR) Contributor

Reciprocating engine backlogs surge as developers favor modular gas-fired BTM solutions for faster time-to-power and shorter lead times.

Natural gas power M&A premiums double as data center demand and capital costs transform U.S. energy market
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s PJM and MISO winter outlook: a record El Niño, capped capacity auctions, MISO scarcity risk and heat rate forecasts for Dec. through Feb.

Aging-power-plant_1418205261-1
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s ISO-NE and NYISO winter outlook: how NECEC and CHPE reshape Northeast spreads, plus RGGI costs, El Niño weather and heat rate forecasts.

EIR’s model shows powered-land can rise more than 20-fold in value as data center sites reach energization
Post
Power & Renewables, Power Trading+1
  • Utilities
ByEnverus

EIR’s CAISO and Mid-C winter outlook: how a stormy El Niño, record battery activity, EDAM vs. Markets+ and carbon prices shape Western power.

Time-to-power gap Big generation’s Achilles’ heel in the AI data center race
Post
Power & Renewables, Power Trading
ByEnverus

PJM has 113.6 GW of announced large-load capacity, far more than the 28.5 GW under construction. See what the gap means for reliability and planning.

U.S. natural gas prices face power demand drag
Post
Power & Renewables, Power Trading
ByEnverus

ERCOT data shows large loads ramping at different rates as solar and battery additions keep pace, with new supply expected to slow in 2027.

Enverus Press Release - Prioritizing renewable PPA offtaker targets proves more challenging than expected
Post
Power & Renewables
ByThomas Popa

Senate’s bipartisan permitting bill data centers grid interconnection could curb speculative queues and speed transmission buildout.

Enverus Press Release - Renewable diesel: Too much of a good thing?
Post
Data Centers, Financial Services+1
  • Power & Renewables
ByEnverus

Validate data center natural gas supply: check pipeline capacity, contracts, routing, and long‑term durability before you commit.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Let’s get started!

We’ll follow up right away to show you a quick product tour.

Sign up for our Blog

Ready to Subscribe?

Ready to Get Started?