Engineering Nurture – Optimizing Well Completions Case Study #2

OPTIMIZING WELL COMPLETIONS AND DELIVERING DRAMATIC PRODUCTION IMPROVEMENTS ON THE BAKKEN

A Drillinginfo led team achieved a four-month production improvement of 49% by developing an optimized completion design for two wells in the Middle Bakkan and Three Forks formations.

Fill out the form to download the case study.

Engineering Nurture – Optimizing Well Completions Case Study #2

Drillinginfo Inc. © Copyright 2018 All data and information is provided “As is.” Privacy Policy Terms & Conditions